In 2020, satellite images of Longboat Key's northern tip showed Greer Island almost stripped of sand. Images from 2025 show a wide beach in the same spot, and most of the sand placed there in 2021 is still on it. The town's public works director says it still looks that way after the major hurricanes.
Walk south from Beer Can Island and the beach changes. The shoreline thins along Gulfside Road and gets narrowest at the Ohana seawall. The town has a plan for that stretch, and it copies what was built at the north tip.
Greer Island, the part that held
Many people on the island know Greer Island as Beer Can Island. It is a peninsula at Longboat Pass with a broad beach and no facilities or lifeguards, so bring your own water and shade. The usual walk-in route from the island side is North Shore Road. In October, Your Observer described it as a narrow residential street with on-street parking that serves Longboat Key's northernmost public beach access.
This tip used to be the hardest place on the island to keep sand. Public Works Director Charlie Mopps told Your Observer in March that it "used to be historically the most erosional part of the island." He blamed the seawall and the pull of the pass: "It's all of that."
The bridge in the background over Longboat Pass is due for replacement eventually. At public hearings in March 2026, the Florida Department of Transportation's preferred option was a fixed-span bridge with 78 feet of clearance. FDOT's five-year program at that point paid for design but not construction, the Anna Maria Island Sun reported. FDOT keeps the study and its alternatives on its project page.
The rocks you step over on the way south
The T-shaped piles of boulders just south of Greer Island are why the sand stayed. The town finished a seven-groin field on the north end in two stages. Two concrete permeable adjustable groins went in first, in 2015, for $2 million. Five T-head rock groins followed with the 2021 islandwide beach renourishment: three north of the concrete pair and two to the south.
Before construction, the five rock groins were estimated at about $12 million. They contain more than 10,000 tons of armor stone set on 1,280 tons of mattress stone. The whole 2021 project put 1 million cubic yards of sand on the beach for $36 million, which was $3.6 million under budget.
You can adjust the two concrete groins. Each one is built from two concrete slabs with open space between them. Crews can bolt smaller concrete blocks into that gap, or take them out, to control how much sand and water pass through. The town has monitored the field since it was finished. "Even after major hurricanes, all the way until now it still looks amazing," Mopps told Your Observer.
The rest of the island has fared worse. In a November 17 report, Your Observer said Longboat Key has lost about 1.2 million cubic yards of sand since 2021. That includes about 400,000 cubic yards in 2024, when several hurricanes hit, and about 700,000 cubic yards in 2025. At the Town Commission workshop on Nov. 9, coastal engineering consultant Al Browder of Olsen Associates called the rate "unusually and suspiciously high." Those are islandwide numbers. In the same period, the north tip kept most of its 2021 sand.
Gulfside Road, where the beach gets thinner
Below the groin field the beach begins to narrow. The town counts the Gulfside Road stretch among the most erosive parts of Longboat Key. Mopps pointed out that the houses west of Gulfside Road sit farther seaward than any others along this stretch. The pass erodes sand downshore from it, and the sea floor offshore is hard bottom.
Because of that, the town has added sand here between the islandwide projects. The latest interim renourishment ended in early 2025 and put about 80,000 cubic yards on the Gulfside Road beach. State grants covered that project, Mopps told Your Observer, and he said the town can't plan on getting that kind of money again. Some of that sand came from dredging Longboat Pass in late 2024 and early 2025. The pass was dredged again in September 2026, and that sand went to Coquina Beach on Anna Maria Island. Manatee County's plan for that project placed 63,450 cubic yards along 0.9 miles of Coquina Beach.
The Ohana seawall, where the beach is narrowest
The Ohana seawall extends out into the Gulf, and the beach is narrowest there. In March 2026, Your Observer reported that the wall was getting repairs, including a new cap. Right now the wall stands higher than the beach around it. Your Observer reported in August that this could change after the next renourishment adds sand. If you plan to keep walking south from here, the Gulf of Mexico Drive sidewalk runs alongside the beach.
Mopps has said the wall is only one reason this part of the beach erodes quickly. "If the Ohana seawall were there or not, it would still be an erosive problem," he told Your Observer in March. "We would still have to correct it."
The next groin field is planned for this stretch
The town wants to build groins along the stretch where the beach is narrowest. The proposed Gulfside Road field has seven T-head groins plus one structure off the Ohana seawall. It would run south from the Ohana wall, at an estimated cost of $6 million to $10 million.
Browder told Your Observer that the town is moving away from repeated renourishment toward "a structural stabilization (strategy) following the model of what was done at the north end." The aim is to stretch the time between renourishments along Gulfside Road to "something around the order of seven to eight years instead of one to two years."
In March, the town was running models of how the groins would affect beaches downdrift. At the Nov. 9 workshop, Browder said the town was "working on trying to answer their questions." He was referring to the state agencies reviewing the project.
The town hopes to pair the groins with the next islandwide renourishment. That project would place 800,000 cubic yards of sand for about $30 million and is scheduled for fiscal year 2028, depending on permits. The sand would come from the sea floor off Egmont Key and Passage Key at the mouth of Tampa Bay. A dune project would follow both.
If the plan works the way the north end did, the beach below the Ohana wall could someday look like Greer Island does now. Until then, the walk south from Beer Can Island passes the north-end groins and ends on the narrower Gulfside Road beach. For more on the north end, see our North Longboat Key neighborhood page, our guide to Longboat Key beaches and our report on the Village's summer projects. Along any stretch of beach, stay out of areas posted for shorebirds and seabirds, as the Florida Fish and Wildlife Conservation Commission asks.
Gulf-front property on the north end varies with the beach in front of it, from the wide sand at Greer Island to the eroding stretch at Gulfside Road. If you own on this part of the island or are considering it, talk with Bruce Myer Group about your real estate plans.